As of Wednesday, February 6, 2020, over 600 people in China have been killed by the corona virus and thousands more cases are being diagnosed by the day, according to the NY Times. With the outbreak so widespread, China had to take drastic measures to help combat against it, including building two large hospital facilities in under two weeks.
Read moreThe Mace Group Built 6-Story, Rising Prefab Factories On Top of Under Construction High Rises
It’s not often that contractors completely invent a new method of building high rises. We’ve certainly seen some very interesting methods in recent projects, such as the “top-down” method that allows the sub and super-structure to be built at the same time, but a contractor in London has a new way to shave time off of the construction schedule of a high rise building.
Read moreConstruction of World’s Tallest Modular Hotel Underway in New York City
Modular construction, on paper, should vastly speed up the process of construction as well as increase the quality. Sections or rooms of buildings are pre-assembled in an environmentally controlled room offsite and then shipped to site as needed. In reality, though, there are many challenges that have kept this type of construction from being more popular. That doesn’t scare hotel giant, Marriott, though, as they are currently underway on the world’s tallest modular hotel.
Read moreWorld’s First Modular Building Code Developed in Australia
Modular building makes a lot of sense: build repetitive structures in a controlled, factory-like setting and transport to the project site and assemble. It should be a more efficient and less expensive way to construct a building, but the truth is, it’s a lot harder than it looks. There’s also no written standard for doing it.
Read more